Your pipeline construction project appears fairly cut and dry, until you evaluate the pipeline location and recognize the obstacles needing to be avoided. Horizontal Directional Drilling (HDD) is an accepted practice for many installations to avoid these obstacles. To successfully design and construct a pipeline detailed planning is required to meet government regulations as well as meet the critical path of the overall project.
For the pre-site planning for HDD crossings of all sizes and lengths, one must determine if HDD is deemed feasible. Drill entry and exit points are carefully defined and coordinates mapped.
Pipeline Solutions provides construction planning and construction cost estimating for Horizontal Directional Drill crossings of all sizes and lengths for your pipeline construction project.
